Transfer bridges for the safe passage of personnel from the overpass to the platform of the railway tank during the upper discharge.

The transition bridge ensures the safe passage of the operator from the overpass to the upper platform of the railway tank for opening the neck and connecting the discharge and filling devices. It is equipped with a corrugated flooring, fences and a balancing (spring) mechanism.
It is installed on the draining and filling platforms of the railway, reclines / rotates to the position of the tank. The material is steel; the flooring is expanded or corrugated sheet.
| Type | Transition bridge (folding / pivoting) |
|---|---|
| Purpose | Safe passage to the platform of the railway tank |
| Reach / length | according to the overpass project |
| Flooring | expanded / corrugated sheet |
| Snap-in | Fencing, balancing mechanism |
| Material | Steel |
| Installation | Plum-filling railway overpass |
State the size or parameters, or send a specification — we will make the selection and prepare a quotation.
Request a quoteLeave your contact details — we will select the model and prepare a quotation. We reply within one working day.