ExEco gas burners

Gas burners ExEco RS5, RS5D, RS5/M

The RS 5 series covers the 80-345 kW range and is available in three versions: single-stage RS5, two-stage RS5D and modulation RS5/M. The design is common — only the power control method differs, so the design is adapted to the operating mode of the boiler.

Gas burners ExEco RS5, RS5D, RS5/M
Specifications
ManufacturerExEco
SeriesRS 5 / RS 5D / RS 5/M
Burner typeMonoblock — three versions according to the type of regulation
Heat output80-345 kW
Fuel typeNatural gas; LPG (after conversion)
Control typeRS5 — single-stage; RS5D — two-stage; RS5/M — modulating with mechanical control
Power supply230 V, 50 Hz, single-phase
Control systemMicroprocessor control and safety unit with fault diagnostics
Flame monitoringIonisation probe, electrode ignition
Combustion headStainless steel blast tube, flame stability disc
Emission classClass 2 to GOST EN 676-2016 — NOx ≤ 120 mg/kWh
ConnectionFlanged, with heat shield and fixing kit
Scope of supplyBurner, gas train adapter, gasket, heat shield, fixings, data sheet and manual
Models and part numbers
ModelHeat output, kWPart number
RS 5160÷330BU010050
RS 5D (LME21)160/208÷345BU010090
RS 5D (MG569)160/208÷345BU010095
RS 5/M80/160÷330BU010120
Design
Questions

Frequently asked questions

What is the power of the burners ExEco RS 5?
The thermal power range of the series is 80-345 kW.
What type of regulation does ExEco RS 5 have?
Three versions: RS5 — single-stage, RS5D — two—stage, RS5/M - modulating with mechanical control.
What kind of gas do ExEco RS 5 burners run on?
As standard, on natural gas. Most models can be converted to LPG (propane-butane) with a conversion kit; the work must be carried out by a certified engineer.
Is the ExEco RS 5 suitable for a boiler from another manufacturer?
Yes. The burners are universal and mount on boilers of both Russian and foreign makes. What matters is selecting the correct size and combustion head length for the specific boiler.
What should I state when ordering?
Boiler output, gas type and mains pressure, control and emission requirements, and the distance from the flange to the furnace. If you do not have the parameters, send the boiler model and we will make the selection.
What are the delivery times?
Fast-moving sizes ship from stock, the rest is made to order. The exact lead time and price are confirmed in the quotation. Delivery across Russia and the CIS.
How do the RS 5D versions differ from LME21 and MG569?
Different control and security units. The heat output and connection dimensions are the same; the choice depends on the automation requirements of the project.

We will select a burner for your boiler

State the boiler output, fuel type and pressure, and the control and emission requirements — we will select the model and prepare an offer with price and lead time.

Request a quote